- There are no more items in your cart
- Shipping
- Total €0.00
76th Infantry Division cut edge
76th Infantry Division cut edge Patch.
(à modifier dans le module "Réassurance")
(à modifier dans le module "Réassurance")
(à modifier dans le module "Réassurance")
76th Infantry Division cut edge Patch. original, WW2.
The 76th Infantry Division arrived in England, 20 December 1944, where it received additional training. It landed at Le Havre, France, 12 January 1945, and proceeded to the Limesy concentration area. The Division moved to Beine east of Reims and then to Champlon, Belgium, 23 January, to prepare for combat. Relieving the 87th Division in defensive positions along the Sauer and Moselle Rivers in the vicinity of Echternach, Luxembourg, 25 January, the 76th sent out patrols and crossed the Sauer, 7 February, and breached the Siegfried Line in a heavy assault. The advance continued across the Prum and Nims Rivers, 25–27 February. Katzenkopf fortress and Irrel fell on 28 February and the attack pushed on toward Trier, reaching the Moselle, 3 March. Driving across the Kyll River, the division took Hosten, 3 March, Speicher on 5 March and Karl on 10 March; swung south and cleared the area north of the Moselle, crossing the river, 18 March, near Mülheim an der Mosel. Moving to the Rhine, the 76th took over defenses from Boppard to St. Goar and crossed the Rhine at Boppard, 27 March. It drove east and took Kamberg in a house-to-house struggle, 29 March. A new attack was launched 4 April and the Werra River was reached the next day. The attack continued in conjunction with the 6th Armored Division; Langensalza fell and the Gera River was crossed, 11 April. Zeitz was captured after a violent struggle, 14–15 April, and the 76th reached the Mulde River on 16 April, going into defensive positions to hold a bridgehead across the Mulde near Chemnitz until VE-day.
Reference: F2E110
Dress suit, embroidered canvas officer belt.
Reference: FEM016
WAC Complete tropical suit
Reference: F2E439